Environmental protection at RETORTE


As a specialised company, RETORTE GmbH supplies worldwide markets in the glass, animal feed, solar and pharmaceutical industries with high-quality selenium products such as high-purity selenium, selenium alloys, sodium selenite and trace element premixes.

RETORTE GmbH Selenium Chemicals & Metals is located in Röthenbach an der Pegnitz, about 10 km east of Nürnberg. The task of the company within the group of companies is the further processing and marketing of selenium, which is a by-product of the copper production process. A significant proportion of the world's annual selenium production is processed at this site in Röthenbach.

RETORTE GmbH supplies users in diverse sectors such as the glass, animal feed, solar and pharmaceutical industries with high-quality selenium products such as high-purity selenium, selenium alloys, sodium selenite and trace element premixes.

Intelligently networked cycles ensure the best possible use of the valuable raw material selenium and by-products are integrated into the cycle. A variety of measures are taken to keep emissions as low as possible and ensure a high level of production safety. In recent years, the wastewater treatment processes have been optimised - as a result, a reduction in the selenium load discharged into the Pegnitz River has been achieved. Furthermore, the site ensures the protection and remediation of existing contaminated sites through technical and financial investments.

Measures implemented in environmental protection (milestones)
Remediation of contaminated sites: Recycling of soil material via Aurubis plant Hamburg

Description of the measure:

  • Use as an additive for slag formation (mainly pure sand).
  • Target: Recovery of selenium at the end of the copper refining process.

Completion date:

  • Summer 2019
Renewal of the asphalt surface

Description of the measure:

  • Rehabilitation of the asphalt including the base course
  • Elimination of sources of danger
  • Sealing of contaminated sites prone to leaching

Completion date:

  • Summer 2019
Current environmental goals and measures
Implementation of the 42nd BImschV

Degree of implementation / next steps:

  • Implementation of a monitoring programme (already done)
  • Inspection of the installations by experts (expected by the end of 2019)
Renewal of the water law permit for the rehabilitation project

Degree of implementation/ Next steps:

  • Submission of application (already done)
  • Public participation (already done)
  • Official permission (expected)